The first phase of the embedded connection tests will be the construction and testing of the two 20” embedded specimen. These specimens feature W14x370 and W18x311 embedded columns, designed to examine the behavioral dependence of the connections on shape of section. The specimens, along with two reinforced concrete blocks to support the axial loading frame are to be poured simultaneously.
11/1/13 – Specimens and side block construction
Bookmark the permalink.