11/26/13 – First two specimens and side blocks poured By Heidi Arnold | November 26, 2013 - 8:00 am |March 11, 2015 Uncategorized The 20-inch embedded specimens and the two reinforced concrete testing blocks have been poured and are in the curing process. Bookmark the permalink.