3/1/13 – Strong floor completion By Heidi Arnold | March 1, 2013 - 7:51 am |March 11, 2015 Uncategorized The laboratory strong floor has been constructed. Multiple procedural delays resulted in a later than expected completion date, however the floor was constructed as originally designed and ready for use. Bookmark the permalink.