3/1/13 – Strong floor completion

The laboratory strong floor has been constructed. Multiple procedural delays resulted in a later than expected completion date, however the floor was constructed as originally designed and ready for use.

interiorsf

sf

 

Bookmark the permalink.

Comments are closed.