The strong floor dimensions were designed in part to accommodate an existing 5-ton crane set at an adjacent location. Concrete tracks were cast and the crane was relocated and positioned such that the crane can now access all areas of the strong floor. The crane will be a valuable asset during test setups, and contributes to creating a fully functional testing facility.
8/5/13 – Crane and track built