{"id":101,"date":"2013-08-05T07:56:20","date_gmt":"2013-08-05T15:56:20","guid":{"rendered":"http:\/\/research.engineering.ucdavis.edu\/columnbases\/?p=101"},"modified":"2015-03-11T07:57:15","modified_gmt":"2015-03-11T15:57:15","slug":"8513-crane-and-track-built","status":"publish","type":"post","link":"https:\/\/research.engineering.ucdavis.edu\/columnbases\/8513-crane-and-track-built\/","title":{"rendered":"8\/5\/13 &#8211; Crane and track built"},"content":{"rendered":"<p>The strong floor dimensions were designed in part to accommodate an existing 5-ton crane set at an adjacent location. Concrete tracks were cast and the crane was relocated and positioned such that the crane can now access all areas of the strong floor. The crane will be a valuable asset during test setups, and contributes to creating a fully functional testing facility.<\/p>\n<p><a href=\"http:\/\/research.engineering.ucdavis.edu\/columnbases\/wp-content\/uploads\/sites\/40\/2015\/03\/track1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-86\" src=\"http:\/\/research.engineering.ucdavis.edu\/columnbases\/wp-content\/uploads\/sites\/40\/2015\/03\/track1-1024x765.jpg\" alt=\"track\" width=\"800\" height=\"598\" srcset=\"https:\/\/research.engineering.ucdavis.edu\/columnbases\/wp-content\/uploads\/sites\/40\/2015\/03\/track1-1024x765.jpg 1024w, https:\/\/research.engineering.ucdavis.edu\/columnbases\/wp-content\/uploads\/sites\/40\/2015\/03\/track1-300x224.jpg 300w, https:\/\/research.engineering.ucdavis.edu\/columnbases\/wp-content\/uploads\/sites\/40\/2015\/03\/track1-201x150.jpg 201w, https:\/\/research.engineering.ucdavis.edu\/columnbases\/wp-content\/uploads\/sites\/40\/2015\/03\/track1-150x112.jpg 150w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The strong floor dimensions were designed in part to accommodate an existing 5-ton crane set at an adjacent location. Concrete tracks were cast and the crane was relocated and positioned such that the crane can now access all areas of the strong floor. The crane will be a valuable asset  \u2026 <a href=\"https:\/\/research.engineering.ucdavis.edu\/columnbases\/8513-crane-and-track-built\/\"> Continue reading <span class=\"meta-nav\">&rarr; <\/span><\/a><\/p>\n","protected":false},"author":10,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-101","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/research.engineering.ucdavis.edu\/columnbases\/wp-json\/wp\/v2\/posts\/101","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/research.engineering.ucdavis.edu\/columnbases\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/research.engineering.ucdavis.edu\/columnbases\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/research.engineering.ucdavis.edu\/columnbases\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/research.engineering.ucdavis.edu\/columnbases\/wp-json\/wp\/v2\/comments?post=101"}],"version-history":[{"count":0,"href":"https:\/\/research.engineering.ucdavis.edu\/columnbases\/wp-json\/wp\/v2\/posts\/101\/revisions"}],"wp:attachment":[{"href":"https:\/\/research.engineering.ucdavis.edu\/columnbases\/wp-json\/wp\/v2\/media?parent=101"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/research.engineering.ucdavis.edu\/columnbases\/wp-json\/wp\/v2\/categories?post=101"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/research.engineering.ucdavis.edu\/columnbases\/wp-json\/wp\/v2\/tags?post=101"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}