{"id":116,"date":"2015-02-03T16:46:53","date_gmt":"2015-02-04T00:46:53","guid":{"rendered":"http:\/\/research.engineering.ucdavis.edu\/gpa\/?page_id=116"},"modified":"2015-02-24T14:22:42","modified_gmt":"2015-02-24T22:22:42","slug":"h-piles-vibratory-hammer","status":"publish","type":"page","link":"https:\/\/research.engineering.ucdavis.edu\/gpa\/foundations-deep\/h-piles-vibratory-hammer\/","title":{"rendered":"H-Piles &amp; Vibratory Hammer"},"content":{"rendered":"<table border=\"0\" width=\"570\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td align=\"left\" valign=\"top\" width=\"544\" height=\"48\">\n<div align=\"left\">These photos are of steel H-piles being installed with a vibratory hammer at Rokko Island, Japan, in 1996.<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div id=\"attachment_837\" style=\"width: 325px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/H-Pile-P1-Labeled.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-837\" class=\"  wp-image-837\" src=\"http:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/H-Pile-P1-Labeled-300x195.jpg\" alt=\"H-Pile P1-Labeled\" width=\"315\" height=\"205\" srcset=\"https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/H-Pile-P1-Labeled-300x195.jpg 300w, https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/H-Pile-P1-Labeled-231x150.jpg 231w, https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/H-Pile-P1-Labeled-150x97.jpg 150w, https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/H-Pile-P1-Labeled.jpg 741w\" sizes=\"auto, (max-width: 315px) 100vw, 315px\" \/><\/a><p id=\"caption-attachment-837\" class=\"wp-caption-text\">Exposed heads of steel H-piles after installation. A horizontal waler beam connects the pile heads together; this is in preparation for excavation of the adjacent soil.<\/p><\/div>\n<div id=\"attachment_838\" style=\"width: 258px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/H-Pile-P2-Labeled.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-838\" class=\"  wp-image-838\" src=\"http:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/H-Pile-P2-Labeled-198x300.jpg\" alt=\"H-Pile P2-Labeled\" width=\"248\" height=\"376\" srcset=\"https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/H-Pile-P2-Labeled-198x300.jpg 198w, https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/H-Pile-P2-Labeled-99x150.jpg 99w, https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/H-Pile-P2-Labeled.jpg 491w\" sizes=\"auto, (max-width: 248px) 100vw, 248px\" \/><\/a><p id=\"caption-attachment-838\" class=\"wp-caption-text\">A vibrating hammer (yellow) installs an H-pile. Alignment of the piles is ensured by the temporary guides on the ground surface.<\/p><\/div>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>These photos are of steel H-piles being installed with a vibratory hammer at Rokko Island, Japan, in 1996. <\/p>\n<p>&nbsp;<\/p>\n","protected":false},"author":69,"featured_media":0,"parent":35,"menu_order":5,"comment_status":"closed","ping_status":"closed","template":"","meta":{"ngg_post_thumbnail":0,"footnotes":""},"class_list":["post-116","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-json\/wp\/v2\/pages\/116","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-json\/wp\/v2\/users\/69"}],"replies":[{"embeddable":true,"href":"https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-json\/wp\/v2\/comments?post=116"}],"version-history":[{"count":0,"href":"https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-json\/wp\/v2\/pages\/116\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-json\/wp\/v2\/pages\/35"}],"wp:attachment":[{"href":"https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-json\/wp\/v2\/media?parent=116"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}