{"id":172,"date":"2015-02-04T08:31:18","date_gmt":"2015-02-04T16:31:18","guid":{"rendered":"http:\/\/research.engineering.ucdavis.edu\/gpa\/?page_id=172"},"modified":"2015-05-11T16:00:09","modified_gmt":"2015-05-12T00:00:09","slug":"caisson-quay-walls","status":"publish","type":"page","link":"https:\/\/research.engineering.ucdavis.edu\/gpa\/retaining-structures\/caisson-quay-walls\/","title":{"rendered":"Caisson Quay Walls"},"content":{"rendered":"<p><b>Caisson Quay Walls in Japan<\/b><\/p>\n<hr \/>\n<p>These photos of quay (&#8220;key&#8221;) wall construction at Port and Rokko Islands, Japan, were taken in 1996 during reconstruction efforts after the 1995 Hygoken-Nanbu (Kobe) earthquake.<\/p>\n<div id=\"attachment_281\" style=\"width: 210px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P1-Thumb.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-281\" class=\"wp-image-281 size-full\" src=\"http:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P1-Thumb.jpg\" alt=\"This cross-section shows a typical quay wall design. The quay wall acts primarily as a large gravity wall retaining the artificial island on one side. Large ships can then dock alongside the quay walls for loading and unloading of goods and materials.\" width=\"200\" height=\"133\" srcset=\"https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P1-Thumb.jpg 200w, https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P1-Thumb-150x100.jpg 150w\" sizes=\"auto, (max-width: 200px) 100vw, 200px\" \/><\/a><p id=\"caption-attachment-281\" class=\"wp-caption-text\">This cross-section shows a typical quay wall design. The quay wall acts primarily as a large gravity wall retaining the artificial island on one side. Large ships can then dock alongside the quay walls for loading and unloading of goods and materials.<\/p><\/div>\n<div id=\"attachment_282\" style=\"width: 310px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P2-Labeled.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-282\" class=\"wp-image-282 size-medium\" src=\"http:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P2-Labeled-300x193.jpg\" alt=\"These quay wall segments are 17 meters tall, and are arranged along the island's edge prior to their placement below water.\" width=\"300\" height=\"193\" srcset=\"https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P2-Labeled-300x193.jpg 300w, https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P2-Labeled-233x150.jpg 233w, https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P2-Labeled-150x96.jpg 150w, https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P2-Labeled.jpg 745w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-282\" class=\"wp-caption-text\">These quay wall segments are 17 meters tall, and are arranged along the island&#8217;s edge prior to their placement below water.<\/p><\/div>\n<hr \/>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<div id=\"attachment_283\" style=\"width: 209px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P3-Labeled1.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-283\" class=\"wp-image-283 size-medium\" src=\"http:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P3-Labeled1-199x300.jpg\" alt=\"An offshore barge is used to lift each segment. The lifting cables pass through the guide-template so that the cables can act vertically (i.e., no inclination) on the quay wall segment.\" width=\"199\" height=\"300\" srcset=\"https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P3-Labeled1-199x300.jpg 199w, https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P3-Labeled1-99x150.jpg 99w, https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P3-Labeled1.jpg 487w\" sizes=\"auto, (max-width: 199px) 100vw, 199px\" \/><\/a><p id=\"caption-attachment-283\" class=\"wp-caption-text\">An offshore barge is used to lift each segment. The lifting cables pass through the guide-template so that the cables can act vertically (i.e., no inclination) on the quay wall segment.<\/p><\/div>\n<div id=\"attachment_284\" style=\"width: 310px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P4-Labeled.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-284\" class=\"wp-image-284 size-medium\" src=\"http:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P4-Labeled-300x192.jpg\" alt=\"A row of quay wall segments has been placed just outside the existing &quot;damaged&quot; quay wall. Later, the space between the old and new walls will be infilled with soil, and the cargo cranes (in the background) will be relocated onto the new quay wall.\" width=\"300\" height=\"192\" srcset=\"https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P4-Labeled-300x192.jpg 300w, https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P4-Labeled-234x150.jpg 234w, https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P4-Labeled-150x96.jpg 150w, https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P4-Labeled.jpg 751w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-284\" class=\"wp-caption-text\">A row of quay wall segments has been placed just outside the existing &#8220;damaged&#8221; quay wall. Later, the space between the old and new walls will be infilled with soil, and the cargo cranes (in the background) will be relocated onto the new quay wall.<\/p><\/div>\n<hr \/>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<div id=\"attachment_911\" style=\"width: 310px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P5-Labeled.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-911\" class=\"size-medium wp-image-911\" src=\"http:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P5-Labeled-300x190.jpg\" alt=\"This close-up of a recently placed quay wall segment shows how the walls are initially hollow.\" width=\"300\" height=\"190\" srcset=\"https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P5-Labeled-300x190.jpg 300w, https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P5-Labeled-236x150.jpg 236w, https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P5-Labeled-150x95.jpg 150w, https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P5-Labeled.jpg 745w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-911\" class=\"wp-caption-text\">This close-up of a recently placed quay wall segment shows how the walls are initially hollow.<\/p><\/div>\n<div id=\"attachment_285\" style=\"width: 310px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P6-Labeled.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-285\" class=\"wp-image-285 size-medium\" src=\"http:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P6-Labeled-300x196.jpg\" alt=\"The quay wall segments are later in-filled with sand and capped with reinforced concrete.\" width=\"300\" height=\"196\" srcset=\"https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P6-Labeled-300x196.jpg 300w, https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P6-Labeled-229x150.jpg 229w, https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P6-Labeled-150x98.jpg 150w, https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P6-Labeled.jpg 735w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-285\" class=\"wp-caption-text\">The quay wall segments are later in-filled with sand and capped with reinforced concrete.<\/p><\/div>\n<hr \/>\n<p>&nbsp;<\/p>\n<div id=\"attachment_286\" style=\"width: 310px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P7-Labeled.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-286\" class=\"wp-image-286 size-medium\" src=\"http:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P7-Labeled-300x194.jpg\" alt=\"Another quay wall segment is being cast alongside completed segments.\" width=\"300\" height=\"194\" srcset=\"https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P7-Labeled-300x194.jpg 300w, https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P7-Labeled-231x150.jpg 231w, https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P7-Labeled-150x97.jpg 150w, https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-content\/uploads\/sites\/43\/2015\/02\/Quay-Wall-P7-Labeled.jpg 745w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-286\" class=\"wp-caption-text\">Another quay wall segment is being cast alongside completed segments.<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p><b>Caisson Quay Walls in Japan<\/b><\/p>\n<p>These photos of quay (&#8220;key&#8221;) wall construction at Port and Rokko Islands, Japan, were taken in 1996 during reconstruction efforts after the 1995 Hygoken-Nanbu (Kobe) earthquake.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"author":10,"featured_media":0,"parent":40,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"ngg_post_thumbnail":0,"footnotes":""},"class_list":["post-172","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-json\/wp\/v2\/pages\/172","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-json\/wp\/v2\/comments?post=172"}],"version-history":[{"count":4,"href":"https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-json\/wp\/v2\/pages\/172\/revisions"}],"predecessor-version":[{"id":1060,"href":"https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-json\/wp\/v2\/pages\/172\/revisions\/1060"}],"up":[{"embeddable":true,"href":"https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-json\/wp\/v2\/pages\/40"}],"wp:attachment":[{"href":"https:\/\/research.engineering.ucdavis.edu\/gpa\/wp-json\/wp\/v2\/media?parent=172"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}