H-Piles & Vibratory Hammer

These photos are of steel H-piles being installed with a vibratory hammer at Rokko Island, Japan, in 1996.
H-Pile P1-Labeled

Exposed heads of steel H-piles after installation. A horizontal waler beam connects the pile heads together; this is in preparation for excavation of the adjacent soil.

H-Pile P2-Labeled

A vibrating hammer (yellow) installs an H-pile. Alignment of the piles is ensured by the temporary guides on the ground surface.

 